NEWS


14
November 2018
Wednesday

In 2019 in Tatarstan will make a rating of management companies (MC). This was announced at a press conference at the IA Tatar-inform by the executive director of NP Regional Center for Public Control in the Sphere of Housing and Communal Services of the Republic of Tatarstan, member of the Public Chamber of the Republic of Tatarstan Dmitry Romanov. “From January 2019, we will launch a rating for the Criminal Code and Homeowners Association of Tatarstan. This rating will allow us to stimulate the Criminal Code to conduct its activities in good faith, efficiently and within the framework of the current legislation, ”Romanov said. The rating will take into account the number of complaints of citizens, the condition of apartment buildings and local area, the presence of failures, as well as holding meetings and community work days, warning residents and the availability of information about the activities of the Criminal Code, said the executive director of the Center for Public Control in the Housing and Utilities of the Republic of Tatarstan. This study is scheduled annually.

A meeting was held at the Main Investment and Construction Directorate of the Republic of Tatarstan on the implementation of the program “Overhaul of buildings of outpatient-polyclinic centers in 2018”. The event was attended by Deputy Minister of Construction, Architecture, Housing and Public Utilities of the Republic of Tatarstan Ildur Nasyrov, as well as representatives of the Ministry of Health of the Republic of Tatarstan, design and contract organizations. During the meeting, issues related to the completion of construction and installation work at the facilities were considered. To recap, in 2018 in the Republic of Tatarstan, under the overhaul program of outpatient clinics, 114 facilities are scheduled for repair. The total amount of funding is more than 3 billion rubles.


13
November 2018
Tuesday

Deputy Minister of Construction, Architecture, Housing and Public Utilities of the Republic of Tatarstan Ilshat Gimaev met with representatives of municipalities on the current state of implementation of housing construction programs in 2018. Opening the meeting, the Deputy Minister noted that the May Decree of the President of Russia Vladimir Putin of 2018 set clear goals for the regions in the construction industry: "Improving the living conditions of our citizens remains one of the key tasks. To solve it, it is important to increase the amount of housing commissioned every year," - he imphasized. Ilshat Gimaev reminded that today the plan for housing commissioning has been fulfilled in 9 municipalities (Pestrechinsky, Laishevsky, Tukayevsky, Vysokogorsky, Tyulyachinsky, Kaibitsky, Kukmorsky, Zainsky and Yutazinsky districts): tasks require rapid joint work of developers and resource supplying organizations. All problematic issues need to be addressed jointly, taking into account the interests of all parties. " The meeting discussed the formation of national programs in the construction sector for 2019-2021. At the end of the meeting, Ilshat Gimaev stressed that the main task is to maintain and improve the pace, paying special attention to the quality of construction.

From November 5 to November 19, 2018, the International School of Young Architect "ARTpolis" is held at the Kazan State University of Architecture and Civil Engineering (KGASU), in which students of the Institute of Architecture and Design take part in the KGASU joint diploma program - the University of East London, students architects from 13 universities in Russia and the near abroad: Perm, Voronezh, Samara, Izhevsk, Magnitogorsk, Orel, Novokuznetsk, Omsk, Saransk, Kursk, Penza and Bishkek (Kyrgyzstan), as well as high school students of Kazan schools, including students Children's architectural and design school "Dashka" (KGASU). The International School is organized by the International Relations Office and the Institute of Architecture and Design of KGASU with the support of the Ministry of Culture of the Republic of Tatarstan. The school is conducted as part of a grant from the Federal Agency for Youth Affairs (Rosmolodezh). The school program consists of three blocks: a theoretical block, master classes and a workshop. The implementation of this project is very important for the city, since the development of culture gives impetus to the development of society and the economy as a whole, forms a favorable background and contributes to the transformation of the territory. The territory of the Kazan Theater of Young Spectators has a great potential to become a center of culture, a place of creative development of Kazan residents of all ages.


12
November 2018
Monday

On November 8, 2018 in the conference hall of KGASU within the framework of the International Scientific and Practical Conference "SMART Polis" / "Intellectual City: Sustainability, Management, Architecture, Renovation, Technology" held at KGASU on November 8-9, a round table "United Information environment as a prerequisite for improving energy efficiency in housing and utilities. " The rector of KGASU R.K. Nizamov and Deputy Minister of Construction, Architecture and Housing of the Republic of Tatarstan I.N. Nasyrov. During the round table, there was a discussion of issues on the topics of reports, issues of interaction between government and non-state structures, education, science and practice, including information cooperation, methods for improving the energy efficiency of apartment buildings, etc. The participants of the event visited the new Center for Engineering Systems KGASU "SYSTEMS". The tour was conducted by the head of the department of heat power engineering, gas supply and ventilation R.A. Sadykov and associate professor R.G. Safiullin. The university guests were shown a conference room, halls of heat generation and microclimate, water supply and drainage, renewable energy sources, were introduced to laboratory complexes and stands, their equipment, and talked about the capabilities of the Center.

 

In the Republic of Tatarstan, in the field of labor protection in construction, the Inspectorate of State Construction Supervision and the State Labor Inspectorate from the beginning of 2018 carried out 1 thousand 263 inspections. For violation of the rules and regulations of labor protection, 391 resolutions were issued for a total amount of 15 million 135 thousand rubles. Irek Faizullin, Minister of Construction, Architecture, Housing and Utilities of the Republic of Tatarstan, began his speech at a meeting in the Government House of the Republic of Tatarstan today. Irek Fayzullin told during the meeting that as of November 9, 2018, 1 million 973.8 thousand sq. m. of housing, which is 82.1% of the plan. According to the program of social mortgage, the State Housing Fund of the Republic of Tatarstan (State Housing Fund

of the Republic of Tatarstan) reported to statistics bodies for 136 houses for 5 thousand 656 apartments with an area of ​315.7 thousand square meters. As of November 9, 2018, the construction of rural clubs was completed at 24 sites: Menzelinsky, Sabinsky, Zainsky, Mamadyshsky, Drozhzhanovsky, Kaybitsky, Laishevsky, Baltasinsky, Spassky, Novosheshminsky, Rybno-Slobodsky, Nurlatsky, Alkeevsky, Axubayevevsky, Yevsheshminsky, Rybno-Slobodsky, Nurlatsky, Alkeevsky, Aksubayevevsky, Evshivskyevsky Aktanyshsky, Yutazinsky, Aznakaevsky, Arsky, Kukmorsky, Alekseevsky, Tetyushinsky, Agryzsky districts. Construction is continuing at 4 sites, including roofing, finishing works, engineering networks at 2 sites in; external engineering networks, landscaping at 2 sites.

In the village of Pokrovsky Urustamak, Bavly District, the House of Culture was opened after major overhaul. The opening ceremony was attended by the head of the Bavly District, Ramil Gatiyatullin, and invited guests. For the repair of the building, 6.7 million rubles were allocated from the republican budget and 1.9 million rubles from the local budget. The area of ​​the object was 367.6 square meters. The roof, facade, engineering networks (heating, water supply, sewerage) were repaired, electrical installation and finishing works, repair of entrance groups, blind areas were carried out, window and door blocks were replaced. We remind you that the implementation of the overhaul program for cultural facilities of the Republic of Tatarstan began in 2015. Over 3 years of the Program implementation, a total of 114 cultural facilities were repaired, total funding amounted to 798.23 million rubles. In 2018, it is planned to overhaul 42 cultural facilities. As of November 1, work is underway at 6 objects. At 36 objects work completed.


9
November 2018
Friday

The federal, regional and municipal mass media, journalists, press services (public relations departments) of municipal administrations covering the construction, architecture and housing and communal services of the Republic of Tatarstan, as well as students of all faculties of technical schools, colleges, institutes and Universities are invited to participation.

An obstetric center has opened today in the village of Stary Urussu of the Yutazinsky district, the executive committee of the Yutazinsky district on social issues reported.

The opening of the feldsher-midwife station was made possible thanks to the republican target program “Improving Primary Health Care for the Population of Tatarstan”.

From 2012 to 2017, 413 first-aid and obstetric points were built for the amount of 1.03 billion rubles. Constructed medical and obstetric facilities are fully equipped with medical equipment and furniture in accordance with the order of the Ministry of Health of the Russian Federation.

In 2017, 42 modular medical and obstetric points for a total of 330 million rubles were built and commissioned. In 2018, it is planned to hand over 44 feldsher-midwife stations.


7
November 2018
Wednesday

According to the monitoring data, in the Republic of Tatarstan in the framework of the overhaul repairing program of apartment buildings as of November 1, 2018, work on 440 objects was completed, 230 apartment buildings were accepted by the State Housing Inspectorate. Alexey Frolov, First Deputy Minister of Construction, Architecture, Housing and Utilities of the Republic of Tatarstan, brought these data today at a meeting in the Government House of the Republic of Tatarstan. The meeting was held by the Prime Minister of the Republic of Tatarstan Alexey Pesoshin. In the videoconferencing mode, the meeting was held with all municipal districts of the republic. Recall that in the overhaul repairing program of apartment buildings for 2018, 43 municipal districts take part (except for Alkeyevsky and Drozhzhanovsky districts).


SUBSCRIBE FOR NEWS
All content on this site is licensed under
Creative Commons Attribution 4.0 International