The restoration of the house began in 2024. Then the builders carried out a whole range of works: strengthening walls, foundations, installation of engineering systems for water supply and sewerage, electricity, electric lighting, heating, installation of shut-off waterproofing. In 2025, roofing and facade works, reinforcement of foundations, arches, repair of engineering and technical service networks, and interior decoration were carried out at the facility.
Major repairs of 31 social service and social protection institutions have been completed in 19 municipalities of Tatarstan. The financing of the work exceeded 148 million rubles.
Engineering networks have been repaired at the facilities, finishing works have been carried out, new equipment and furniture have been supplied and installed.
The builders repaired the main building, the food hall, the laundry room, the storage room, the roof and the facade. The installation of window and door openings, entrance groups, and installation of internal engineering networks has been carried out here.
The roof, facade, assembly and sports halls, locker rooms, and facilities for leisure activities have been renovated in the building. Engineering networks have also been replaced, finishing works and the installation of the entrance group have been completed.
In Agryz, builders have overhauled the sports hall at secondary school No. 2.
The roof and facade were completely renovated, engineering and technical support networks were replaced, finishing works were carried out, new windows, doors, and a video surveillance system were installed.
This year, 226 medical institutions worth RUB 3 billion 424 million have been included in the programs.
This year, the engineering and technical support networks have been repaired - heating, water supply, sewerage, electrics.
Today, students of 10 secondary schools in Tatarstan have started the school year in completely renovated buildings.