The objects of new construction, which are planned in historical settlements, were presented today to the President of the Republic of Tatarstan Rustam Minnikhanov at a meeting of the interdepartmental commission on urban development in historical settlements. The meeting was attended by the Minister of Construction, Architecture and Housing of the Republic of Tatarstan Marat Aizatullin.
The meeting of the commission is being held this year for the first time. New construction projects in Kazan, Buinsk and Mamadysh were considered.
Ilsiyar Tukhvatullina, the chief architect of the capital, presented the projects in Kazan – a total of 19 objects were considered.
The first project is the reconstruction of the Kazan State Theater for Young Spectators on the street.Ostrovsky, 10. Courtyard area, facades, outbuildings are involved. The project was approved by the members of the interdepartmental commission.
The next project was the renovation of the facades of the multifunctional complex "Suvar Plaza" on Spartakovskaya Street. The project involves both the renovation of facades and the formation of office space from 2nd to 4th floors. He also received approval.
Next, the concept of the sports block of the "Sun" school on the street was presented.Kavi Najmi. This project has already been discussed several times, and today it has received the approval of the members of the commission.
A project for the construction of a residential building on Astronomical Street has also been approved. There will be 21 apartments, parking, and other modern infrastructure. Rustam Minnikhanov instructed to ensure that high-quality building materials are used in the construction process.
The next project was the industrial building on Lebedev Street. The construction of the facility has been approved.
Next, Ilsiyar Tukhvatullina presented a project for the reconstruction of the Chekhov market. "We have long wanted to carry out reconstruction," Rustam Minnikhanov reminded. – The building will have an extension and a modern courtyard. This market enjoys the attention of the population." Chekhov's market will be given a modern look, and the courtyard space will also be actively used.
The project of the administrative building (IT center) on the street was also approved. The underbelly. Two variants of the color solutions of the facades were presented, the members of the commission settled on a lighter color solution.
The next project presented was the reconstruction of the cultural heritage site "Residential House, XVIII century" (7 Gayaza Iskhaki str.). As representatives of the design company noted, the house has reached our time in a completely destroyed form, only one and a half walls remain of it. The project with a modern architectural solution of reconstruction was approved.
The residential building at the intersection of Salikh Saidashev St. and Sarah Sadykova St. was approved taking into account the study of the color scheme of the facade.
Further, the architectural and construction concept for the development of the territories adjacent to Mezhlauka and Narimanov Streets was announced to the members of the commission. According to the architectural community, this quarter is interesting because it is adjacent to the River Port and will be in demand as walking routes for tourists and citizens. The concept covers several buildings, an inner courtyard area, and other buildings. The project sparked discussion and was generally approved, but with additional improvements to the courtyard.
The project of a 2-storey red brick office building on Malaya Krasnaya Street was also approved.
The next project in the center of Kazan is the improvement of the pedestrian zone (stairs) along Ulyanov-Lenin and Tikhomirnov streets. Several options are presented, including those linked to the landscape.
Further, the reconstruction project of the existing building on Astronomical -Trade Union Street was approved.
The next object was considered – an already existing multi-storey residential building on Mayakovsky Street. The members of the commission agreed that the object can be agreed on one condition – the tallest element of the building (corner tower) will be lowered.
Further, projects for the construction of three individual residential buildings were approved - on Pekhotnaya Street, on Transversely-Podluzhnaya, Koreanskaya street.
This concludes the review of the projects proposed for construction in the center of Kazan.
The object of new construction in Buinsk was presented by Rinat Gilfanov, head of the Architecture Department of the Executive Committee of the Buinsk municipal district. This is a project of the Baki Urmanche Museum. The museum project is a three-storey building at the fork of two streets in Buinsk.
The building project has been approved.
The chief architect of the executive committee of the Mamadysh municipal district, Adel Sibgatullin, reported on the construction project of the Orthodox church of the Holy Trinity in Mamadysh (Sovetskaya St.). This site is the historical location of the Cathedral of the Life-Giving Trinity of the XVIII century (1781-1783), which was demolished in 1933. The project has been approved.