The residential complex "Three bears" in Elabuga are equipped with modern boilers
25 July 2014, Friday
The complex of rental housing "Three bears" in Elabuga built two modular boiler rooms. The complex consists of specialized secondary school with profound study of English language, with attached to it kindergarten. The complex consists of 40 houses, a residential building for specialists of companies-residents SEZ "Alabuga", houses for teachers, and community center. Today in boiler rooms performed commissioning work, each boiler house is on three gas-fired boiler - two of them are primary and one backup. The power of the first boiler house is 4000 watts, the power of the second - 3000 watts.
Boiler rooms are also equipped with the system of output signal working boiler-house to control point of the SEZ "Alabuga".
The All-Russian voting for selecting priority improvement projects for 2027 is ongoing. As of May 4, 203,000 people in Tatarstan have made their choice.
Major repairs of utility networks in the 31st microdistrict of Naberezhnye Chelny are ongoing. The work began in 2025 within the framework of the national project “Infrastructure for Life.” At that time, 1.2 km of sewer networks were replaced and 30 reinforced concrete wells were installed.
The progress of housing construction was reported by the Minister of Construction, Architecture and Housing and Communal Services of the Republic of Tatarstan, Marat Aizatullin, at a traditional meeting held at the Government House of the Republic of Tatarstan.
In the current year, 14 new sports facilities are planned to be built in Tatarstan. This was recalled by the Minister of Construction, Architecture and Housing and Communal Services of the Republic of Tatarstan, Marat Aizatullin, at a traditional meeting held at the Government House of the Republic of Tatarstan.
SUBSCRIBE FOR NEWS
All content on this site is licensed under
Creative Commons Attribution 4.0 International
If you see a mistake,
please select the word or sentence and press CTRL+ENTER