On the construction and reconstruction of heat supply systems of Naberezhnye Chelny till 2030 will require more than 7 billion rubles.
The draft scheme actualization heating will be presented to residents at a public hearing in the city hall of the city.
Among the largest construction funds for the coming years are: the area of "Youth" (896,3 thousand square meters), Orel field (652,2 thousand square meters), the villages of the "Green Line" (169 thousand square meters) and "Red boats" (127 thousand square meters), and "Engineering" (304,5 thousand square meters), and "Yashlek" (357 thousand square meters), "Their-2" (330 thousand square meters) and 19 complex (230 thousand square meters).