Determination of the heat demand for heating, ventilation and hot water.
7 December 2015, Monday
GAU "UGAZ RT" offers services for calculating the heat demand for heating, ventilation and hot water in accordance with MDK 4-05.2004 "Method of determining fuel requirements, electric energy and water during production and the transfer of thermal energy and heat carrier in the systems of a communal heat supply".
In district heating systems the thermal energy is consumed for heating of buildings, heating of supply air in the installations of ventilation systems and hot water in hot water supply systems.
Specific heat consumption for heating, ventilation and hot water is the amount of heat energy which needs to be submitted inside the building to maintain it in normalized settings that are comfortable for work and living.
Budget organizations need to undertake the calculation of specific annual heat consumption for heating, ventilation and hot water in order to substantiate the needs for thermal energy and determining the volume of funding.
GAU "UGAZ RT" offers services for calculating the heat demand for heating, ventilation and hot water in accordance with MDK 4-05.2004 "Method of determining fuel requirements, electric energy and water during production and the transfer of thermal energy and heat carrier in the systems of a communal heat supply".
More detailed information can be obtained from:
Kazan, Volkov St., 60/12
phone: (843) 520-70-50 (EXT. 170, 175, 150, 153;
Fax: (843) 520-70-50 EXT.157
e-mail: cenoobrazovanie-rt@tatar.ru
To date, more than 126,000 residents of Tatarstan have taken part in the All-Russian online voting to select improvement projects. This was announced by the Minister of Construction, Architecture and Housing and Communal Services of the Republic of Tatarstan, Marat Aizatullin, at a briefing at the Government House of the Republic of Tatarstan.
In Tatarstan, the All-Russian online voting is ongoing to select public areas planned for improvement in 2027. The voting is held within the framework of the federal project “Formation of a Comfortable Urban Environment” of the national project “Infrastructure for Life.”
Under the state program “Integrated Development of Rural Areas,” the construction of a school in Buinsk continues with funding exceeding 766 million rubles.