NEWS


30
August 2021
Monday

Summer is drawing to a close and the date of the new school year is approaching. The builders of Tatarstan built and overhauled the educational institutions of the republic. More than 7 thousand students will be able to meet on September 1 in new schools. Among them is a comprehensive school for 1501 places with a swimming pool in a residential complex on the street of N. Ershov in the Sovetsky district of Kazan, a comprehensive school for 500 children in the village of Usady, Laishevsky Municipal District, a school for 1224 children in the block 3-9 of the Salavat Kupere residential area in Kazan, a school for 1224 children in the city of Naberezhnye Chelny microdistrict Zamelekissye, a school for 1224 students in the city of Naberezhnye Chelny, Chulman Avenue ("Adymnar"), a school for 462 students in the village Aktanysh of the Aktanysh Municipal District of the Republic of Tatarstan, a school for 1224 places in the village of Kuyuki, Pestrechinsky municipal district. By the order of the Cabinet of Ministers of the Republic of Tatarstan dated January 22, 2021 No. 96-r, funds in the amount of 2 billion rubles were allocated for the overhaul of general and preschool educational institutions of the Republic of Tatarstan in 2021. Within the framework of this budget, by the end of the year, it is planned to overhaul 212 educational facilities - schools and kindergartens. To date, work has been completed in 31 municipal schools, 10 special (correctional) schools, 116 functional zones in educational institutions, 38 kindergartens, and 1 municipal school has also been reconstructed. In addition, work was carried out to adapt the unimpeded access of people with disabilities and other low-mobility groups of the population (accessible environment): in 3 facilities, work has been completed  (2 kindergartens and one school). In order to implement the program of overhaul of catering units of general educational organizations of the Republic of Tatarstan, this year, by order of the Cabinet of Ministers of the Republic of Tatarstan, funds in the amount of 1 billion rubles have been allocated, for which 196 facilities are being repaired. Within the framework of this program, the following are carried out: - repair and finishing work in the premises of the catering units (floors, walls, ceiling); - repair of internal engineering networks - purchase of equipment (stoves, ovens, cooking boilers, hoods, dishwashers, cabinets, showcases, distribution lines, refrigeration equipment, etc.). The scope of work under this program is 99 percent.

The website of the Ministry of Construction, Architecture, Housing and Communal Services of the Republic of Tatarstan has updated information on obtaining a permit for the construction of a capital construction facility. The section "Urban Development" provides information about the authorities of the Republic of Tatarstan, providing services in the field of Construction.

In the appendix (https://minstroy.tatarstan.ru/11-informatsiya-ob-organah-vlasti-respubliki.htm), you can also familiarize yourself with:

- instructions for issuing a permit for the construction of a capital construction facility;

- with a list of addresses and telephone numbers of local self-government bodies authorized to issue a permit for the construction of a capital construction object;

- with a sample application to the Ministry of Construction, Architecture, Housing and Communal Services of the Republic of Tatarstan;

- with the order of the Ministry of Construction and Housing and Communal Services of the Russian Federation of February 19, 2015 No.117 /pr "On approval of the form of a building permit and the form of a permit to put an object into operation"; - also with the administrative regulations approved by the order of the Ministry of Construction, Architecture, Housing and Communal Services of the Republic of Tatarstan for the provision of public services for the issuance of a permit for the construction of a capital construction facility dated May 24, 2021 No. 89 /o.


28
August 2021
Saturday

Alexey Frolov, First Deputy Minister of Construction, Architecture, Housing and Communal Services of the Republic of Tatarstan, reported on the implementation of republican programs for capital repairs of the housing stock and social facilities today at a meeting in the Government House of the Republic of Tatarstan. Alexey Frolov said that within the framework of the republican programs for the overhaul of social and cultural facilities, engineering infrastructure and apartment buildings in 2021, the current implementation is 85%. This year Tatarstan is implementing 27 such programs. In total, they include about 3.5 thousand objects. The program budget is over 23 billion rubles. To date, the implementation of six programs has been completed - these are 83 objects for 387 million rubles. With regard to the programs being implemented, the situation is as follows. In the field of education, a total of three programs are being implemented - these are 413 objects, of which 384 have already been completed. In general, the scope of work is 98% completed. Under the program of overhaul of medical hospitals, 5 out of 18 objects have been completed, work is underway on 13. Volume closed at 77%. Also, 5 out of 9 objects, provided by the passport of the program of overhaul of teenage clubs, have been completed. Four clubs in the works. Construction and installation works were performed by contractors by 73%. According to the program of overhaul of sports facilities, 10 of 18 facilities remain in operation. The scope of work is 91% closed. 98% is the implementation of the program of overhaul of educational institutions in the cultural sector. Four of the 6 facilities included in the program have been completed, 2 facilities are at the final stage. The program of overhaul of stationary social service organizations. Construction and installation work performed by 96%. 25 facilities have been completed, 4 are being repaired. 4 out of 8 facilities have been completed under the program "Modernization of treatment facilities and overhaul of sewerage networks". 5 of them are in operation. Construction and installation work is completed by 71%. According to the program "Restoration of street lighting", the plan was fulfilled by 94%. This week's work has been completed in six districts. It remains to complete work in 3 more - Tyulyachinsky, Nizhnekamsk and Kazan. 96% is the implementation of construction and installation work within the framework of the program "Replacement of boilers in boiler houses of budgetary institutions." As part of the preparation for the heating period 2021 - 2022, 3 thousand 210 boiler houses have been prepared to date, which is 98%.


27
August 2021
Friday

6 out of 11 competitive applications from the republic became winners of the All-Russian competition for the best projects for creating a comfortable urban environment in small towns and historical settlements. The results of the competition were summed up by the Chairman of the Government of the Russian Federation Mikhail Mishustin on August 26 at the forum "Environment for Life" in Nizhny Novgorod. This year, 10 cities and 1 village took part from the Republic of Tatarstan: Agryz, Elabuga, Arsk, Bavly, Zainsk, Kukmor, Laishevo, Leninogorsk, Bolgar, Chistopol and the village of Bilyarsk. Six Tatarstan projects received a grant. In the nomination "Historical Settlements" the winner was the cultural and recreational cluster "Altyn Daga" in Bilyarsk. In the nomination “Small towns with a population of up to 20 thousand people” grants will be received by the project “Kukmorskie showcases. Revitalization of the central city streets named after Voroshilov and Lenin” in Kukmor, as well as a project for the improvement of Karl Marx Street in Agryz. In the nomination “Small towns with the number of inhabitants from 20 to 50 thousand people”, the project for the improvement of the frame of public spaces of the 27th microdistrict “Connecting Bavly” in Bavly and the project “TatArsk legends - to the city by the old road on the street Communy" in Arsk. In the nomination “Small towns with the number of inhabitants from 50 to 100 thousand people” the winner was the City embankment of the Kama river “Narechye” in Chistopol. Commenting on the results of the competition, Deputy Prime Minister of the Government of the Russian Federation Marat Khusnullin said that 307 bids from 73 constituent entities of the Russian Federation were submitted for consideration, which subsequently passed the selection of experts in the field of architecture, urban planning, economics, sociology, protection of cultural heritage and archeology. As a result of this stage, the Interdepartmental Working Group selected 160 finalists-winners from 65 constituent entities of the Russian Federation. According to the decision of the Interdepartmental Working Group, within the same category, the winning projects will receive equal funding. Thus, 16 winners in the Historical Settlements category will receive 56.25 million rubles each. In the category "Small towns" 26 winners of the subgroup with a population of 50 to 100 thousand people will receive 80 million rubles each, 56 winners in the subgroup with a population of 20 to 50 thousand people will receive 70 million rubles each, and in the subgroup with a population up to 20 thousand people 62 winners will receive 50 million rubles each. The money will be used for the creation and improvement of recreational spaces, including the organization of pedestrian zones in historical centers, the reconstruction of cultural sites, the arrangement of squares and squares, as well as the repair and construction of embankments.


26
August 2021
Thursday

Acceptance of applications will begin on September 1.

A mass media competition for the best coverage of construction, architecture, housing and communal services in the Republic of Tatarstan starts in September. Applications are accepted from September 1 to September 30 (inclusive).


25
August 2021
Wednesday

As part of the visit, he took part in the opening of a new school in the Zamekesye microdistrict. Gymnasium No. 14 is designed for 1224 students. The building has a swimming pool with two bowls, a gym, a library, a dining room and an assembly hall. When decorating the premises, unique design solutions were used. Rustam Minnikhanov noted that all conditions for the comprehensive development of children have been created in the new school: “Thanks to the builders for the high-quality and efficient work. A very worthy facility that meets the most modern standards. Here, schoolchildren will be able to study in one shift. The school has a serious sports base, many additional educational programs. I wish the children prosperity and good knowledge. They are our future." Then the President inspected the classrooms of the gymnasium. At the entrance, Rustam Minnikhanov was informed about the system of access to the educational institution. There is a security checkpoint at the door. Access control is carried out using personalized cards. Also, the school is equipped with a voice notification system, which is installed at the admission point and in the director's office. The device allows you to broadcast announcements through the speakerphone throughout the school.

DOM.RF has launched the second stage of a pilot regional internship program for training young professionals in the housing and financial industries. Specialists of the government and specialized state departments of the Republic of Tatarstan arrived at the Institute for Development in the Housing Sector on a three-day return visit. Tatarstan was chosen as the first region for mutual internships, as one of the leaders in terms of housing construction and the formation of a comfortable urban environment. In early July, 10 employees of DOM.RF visited Kazan and got acquainted with the housing and urban practices implemented here. Now a delegation of 14 specialists from Tatarstan will plunge into the work of the Unified Institute for Development in the Housing Sector for three days. “Exchange internships are a good opportunity to look at the situation in the construction industry through the eyes of the direct participants in the process. The interns will meet with the key leaders of DOM.RF, and it is also important for us to get feedback from young specialists,” - said Artyom Fedorko, Deputy General Director of DOM.RF, welcoming the interns. “Any mutual meetings are always useful, the DOM.RF program gives us the opportunity of live communication with colleagues with whom we constantly interact at work remotely. From the exchange internship, we expect new experience, knowledge about the development vectors of the Development Institute and the construction industry as a whole. We are confident that we will be able to apply this experience at home,” - commented Dinar Sagdatullin, head of the construction complex development department of the Ministry of Construction, Architecture, Housing and Communal Services of the Republic of Tatarstan.


22
August 2021
Sunday

Since the beginning of the year, Gosstroynadzor has carried out 1 thousand 90 inspections. 87 resolutions were issued for a total amount of 5 million 27 thousand rubles. Self-regulatory organizations carried out 1,234 checks on their own. The Main Investment and Construction Directorate of the Republic of Tatarstan, which is responsible for carrying out control and supervisory measures at facilities under construction according to state programs, went to the sites with inspections 543 times. In general, out of all 855 violations identified, 846 were eliminated. Such data were presented today at a meeting in the Government House of the Republic of Tatarstan by the First Deputy Minister of Construction, Architecture, Housing and Communal Services of the Republic of Tatarstan Alexei Frolov.

Education. A total of 415 facilities are included in the three programs, of which 227 have already been completed. The volume of completed construction and installation works is estimated at 92%. The most ambitious is the program for the renovation of educational institutions. To date, 22 out of 32 secondary schools have been completed. The contractors still have 10 facilities. The fulfillment is 97%.

16 preschool educational institutions are being built in the republic under federal projects - "Housing" and "Promotion of Women's Employment". Of these, 15 are in the work of contractors. The total work performance has approached 80%.

Public spaces. Within the framework of the federal project "Formation of a comfortable urban environment" 49 objects are being improved this year. The renovation of 8 public spaces - winners of the Small Towns Competition is also underway. Construction and erection works in two directions are closed by 60%. Ecology. The first stage of reconstruction of the Kazan treatment facilities is underway under the federal project “Rehabilitation of the Volga”. The degree of work completion here is 26%. A little more than 2% of the planned volume of work is left for contractors to close on the construction of biological treatment facilities in the village of Koschakovo. Reclamation of an unauthorized landfill in the village of Prosty, Nizhnekamsk region, which is part of the "Clean Country" federal project, has been reclaimed by 95%. Work at the facility is 95% complete. A water treatment plant is being built in the village of Vasilyevo, Zelenodolsk District, under the "Clean Water" project. The work on the object is 60% completed. According to the federal project "Housing", this year the treatment facilities in the residential complex "Svetlaya Dolina" are being reconstructed and the construction of water supply networks is underway in the residential complex "Leto".


20
August 2021
Friday

Today, in the Muslyumovo district of the Republic of Tatarstan, a meeting was held on the issues of urban development in the Republic of Tatarstan. The meeting was held in the district house of culture in the village of Muslyumovo and was attended by First Deputy Prime Minister of the Republic of Tatarstan Rustam Nigmatullin, Head of the Office of the President of the Republic of Tatarstan Asgat Safarov, Chairman of the Council of Municipal Formations of the Republic of Tatarstan Ekzam Gubaidullin, heads of municipalities, heads of republican ministries and departments. Before the beginning of the meeting, the participants of the event examined the courtyards in the village of Muslyumovo, landscaped this year within the framework of the President's program "Our yard". The guests also visited the Koyashly Yk embankment, the production site of the Agromaster company and the children's art school. The main report on topical issues of territorial planning in the Republic of Tatarstan was made by the Minister of Construction, Architecture, Housing and Communal Services of the Republic of Tatarstan Marat Aizatullin. The issues of the implementation of urban planning activities, territorial planning in the territory of the Republic of Tatarstan are still relevant. Municipalities of the republic are provided with approved documents of territorial planning and urban planning zoning, at the same time, about 40% of these documents were developed in 2011-2012 and need significant updating. “The territorial reserves laid down in the general plans of most settlements in the Republic of Tatarstan have been depleted faster than forecasts. First, it is a consequence of population growth. Secondly, this is an increase in the provision of living space. Thirdly, it is the low efficiency of using the territories,” - said Marat Aizatullin. As the head of the department noted, at the beginning of 2020, 484 master plans and 816 rules for land use and development were required to be finalized. To date, there are 378 general rules and 679 rules for land use and development. “The lack of finalized rules for land use and development and the cadastral registration of the boundaries of territorial zones set by January 1, 2024 will not allow the issuance of construction permits and thereby make it impossible to carry out investment activities, as well as the implementation of national projects,” - the minister said. He also noted the need to revise approaches to the development of territories in general, to make balanced decisions when planning the implementation of housing construction, social infrastructure with the synchronization of programs for the construction of transport and engineering infrastructure.

The opening of a new polylingual boarding school "Adymnar" took place today in the village of Aktanysh. The ceremony was attended by President of Tatarstan Rustam Minnikhanov, State Councilor of Tatarstan Mintimer Shaimiev, Chairman of the State Council of the Republic of Tatarstan Farid Mukhametshin and head of the Federal Service for Supervision in Education and Science (Rosobrnadzor) Anzor Muzaev. In his welcoming speech, Rustam Minnikhanov thanked the builders, noting that the school was built with high quality and commissioned on time. In general, the Aktanysh region pays great attention to education issues and improving the material and technical base of educational institutions, the President of the Republic of Tatarstan noted. “We pin great hopes on the Aktanysh region. We hope that the Adymnar complex will work successfully. All conditions have been created here for the study and development of our children,” - added Rustam Minnikhanov. Mintimer Shaimiev reminded that “Adymnar-Aktanysh” is already the fourth polylingual complex in the republic. Earlier educational institutions were opened in Kazan and Yelabuga. The concept of the complex involves teaching in Russian, Tatar and English. In the coming years, it is planned to create two more such educational institutions. The new school is designed for 462 students. The structure of the complex consists of a multilingual school and preschool education within the framework of network interaction with preschool educational institutions No. 6 and No. 3. Students in grades 5-11 will be able to study Arabic and Turkish. Earlier, as part of his visit to Aktanysh, Rustam Minnikhanov visited a technological college. 380 people study here under the programs of secondary vocational education. 70 teachers and masters are working with the children. Training is conducted in such areas as tractor driver, mechanization / electrification / automation of agriculture, economics and accounting, veterinary medicine and a number of other demanded working specialties. In 2017, the Aktanysh Technological College was awarded the status of a resource center.


SUBSCRIBE FOR NEWS
All content on this site is licensed under
Creative Commons Attribution 4.0 International