The builders repaired the main building, the food hall, the laundry room, the storage room, the roof and the facade. The installation of window and door openings, entrance groups, and installation of internal engineering networks has been carried out here.
The roof, facade, assembly and sports halls, locker rooms, and facilities for leisure activities have been renovated in the building. Engineering networks have also been replaced, finishing works and the installation of the entrance group have been completed.
In Agryz, builders have overhauled the sports hall at secondary school No. 2.
The roof and facade were completely renovated, engineering and technical support networks were replaced, finishing works were carried out, new windows, doors, and a video surveillance system were installed.
This year, 226 medical institutions worth RUB 3 billion 424 million have been included in the programs.
This year, the engineering and technical support networks have been repaired - heating, water supply, sewerage, electrics.
Today, students of 10 secondary schools in Tatarstan have started the school year in completely renovated buildings.
According to the republican program, in the village of Narmonka in the Laishevsky district of Tatarstan, builders have overhauled the rural house of culture.
Major repairs have been completed in Kazan Library No. 25 at 47 Begimova Street. The work was carried out under the federal project "Family Values and Cultural infrastructure", which is part of the national project "Family".
In the village of Novy Michan, Sabinsky district, a major renovation of the House of Culture has been completed. One-storey building with a total area of 444 sq. m. The building was built in 1978 and during this time it has never been renovated.