Today in Mendeleevsk, took place the settlement of a 60-apartment residential building on 16 Tukaya Street. The keys to the new building were received by workers of the budgetary sphere and local enterprises, young families and orphans. The head of the district Valery Chershintsev and the deputy of the State Duma of the Russian Federation Alfiya Kogogina congratulated citizens on the joyful event. The total area is 3245.7 square meters. The number of apartments in the house is 60 (one-room - 20, two-room - 21, three-room - 19 apartments). This year in the Republic of Tatarstan it is planned to build 2 million 670 thousand square meters of housing. 280 thousand sq. meters of them will be built under the social mortgage program.
As part of a working trip to Nizhnekamsk, President of Tatarstan Rustam Minnikhanov launched the construction of two educational facilities at once: technical lyceum No. 38 and the Center for Child Development - kindergarten No. 100. Rustam Minnikhanov noted that the construction of new facilities was financed by the Tatneft company, which pays great attention to the implementation of socially significant projects in the republic. The future lyceum will be attended by about 800 children from microdistrict 34. It will become the first engineering school in the Nizhnekamsk region, the educational process of which will be aimed at training applicants for the Nizhnekamsk Chemical-Technological Institute and the Almetyevsk Higher Oil School. The construction of a kindergarten will increase the availability of preschool education. It will be attended by 320 kids from 2 to 7 years old.
Tatarstan President Rustam Minnikhanov paid a working trip to the city of Zainsk. As part of the visit, he visited a children's music school after capital repairs, got acquainted with the implementation of the program "Our yard" and met with regional farmers. A music school was opened in Zainsk in 1961. Overhaul of the building began this spring. All work was completed in August. The institution is designed for 271 students. The music school has 5 departments: orchestral, piano, folk, choral singing, theoretical. Training is conducted in 15 specialties. Pupils actively participate in competitions of various levels and win prizes. Then the President visited the courtyard of an apartment building 53A Gagarin St. According to the program "Our yard", work was carried out here on the improvement of sidewalks and platforms. New lighting poles were installed. In total, 175 households are planned to be renovated in the Zainskiy region for 5 years of the program. Rustam Minnikhanov also got acquainted with the improvement of the square in front of «Energetik» house of culture. Today, this facility is an important urban space, which includes a cultural zone and elements dedicated to the heroes and events of the Great Patriotic War and military operations. The repair work was carried out in 2 stages. During this time, new paving stones were laid here, benches, a fountain, small architectural forms were installed, and the territory was landscaped.
The meeting on the design and construction of engineering networks of the Laishevsky node was held today by the Minister of Construction, Architecture, Housing and Communal Services of the Republic of Tatarstan Marat Aizatullin. The meeting participants discussed the preparation of design and estimate documentation and a project for planning the territory of the Laishevsky unit. In addition, the subject of discussion was the construction of a water supply system, utility and storm sewer networks in the Laishevsky municipal district of the Republic of Tatarstan. The working meeting was held in the Ministry of Construction of the Republic of Tatarstan, it was attended by the head of the Laishevsky district Ildus Zaripov, the head of the Pestrechinsky district Ilham Kashapov, the deputy minister of construction, architecture, housing and communal services of the Republic of Tatarstan Vladimir Kudryashev, representatives of the Executive Committee of Kazan, other ministries and departments, customer services and design organizations.
Acceptance of applications will begin on September 1.
A mass media competition for the best coverage of construction, architecture, housing and communal services in the Republic of Tatarstan starts in September.
Applications are accepted from September 1 to September 30 (inclusive). Individual authors, journalistic collectives, editorial offices of mass media registered in the manner prescribed by law are invited to participate.
Minister of Construction, Architecture, Housing and Communal Services of the Republic of Tatarstan Marat Aizatullin reported on the progress of construction of facilities within the framework of republican programs and national projects, provision of housing for certain categories of citizens. This year, 17 republican programs are being implemented in the republic with a total estimated cost of more than 8 billion 600 million rubles. To date, the planned program activities have been completed by 70%. 11 billion rubles are allocated for the implementation of national projects in the republic through the Ministry. Here the volume of execution is somewhat higher - 80%. 11 out of 95 objects included in the national projects have been fully completed. The Minister noted that the beginning of the new academic year was marked by the opening of 2 secondary schools in the "Art City" RC and "Salavat Kupere" RC. Within the framework of the federal projects "Housing" and "Promotion of the employment of women", 16 kindergartens are being built in the republic. Of these, 11 are still in the work of the contractors. The total work performance has approached 84%. To date, 2 objects have been commissioned. Modernization of utilities. According to the federal project "Housing", this year the treatment facilities in the residential complex "Svetlaya Dolina" are being reconstructed, the work completion is 29%. Public spaces. This year the Federal project "Formation of a comfortable urban environment" includes 49 objects. Construction and installation work is 74%. Eight objects are being improved as winners of the Small Towns Competition. According to them, construction and installation works are closed by 71%. Preparations for the heating period 2021 - 2022. A total of 3 thousand 250 boiler houses were prepared, which is 99.5%. It remains to complete the preparation of 17 boiler houses in 7 districts. Readiness for educational facilities is 99.6%, for healthcare facilities - 99.5%, for cultural facilities - 99.6%, for sports facilities - 98%. The preparation of social protection facilities has been completed. Readiness passports were issued for 16 thousand 859 apartment buildings, which is 96.5%.
The youth housing competition will run until September 20. The competition for housing on preferential terms under the social mortgage program among leaders of youth policy, young professionals, teachers, educational workers will continue until September 20, 2021. Young specialists, youth activists aged up to 35 years old who carry out labor and social activities in the field of youth policy implementation, work with youth of the Republic of Tatarstan in the following areas can take part in the competition: Activists of public organizations; Youth - participants in projects of youth policy of Tatarstan, student self-governments and creative associations; Youth specialists of executive committees, institutions, teenage clubs, youth centers; Young teachers and youth workers of educational institutions; The advantage and peculiarity of the Competition is that young people who are not married can participate and purchase their own housing on preferential terms. The innovation of the 2021 Competition is the ability to submit an initial application in the online format by clicking on the link from any mobile device and personal computer https://inlnk.ru/3ZXow . Detailed information on participation in the competition, submitting an application can be found in the official group “Youth Housing Competition of the Republic Tatarstan" (https://vk.com/mol_ipoteka).
At the Government House of the Republic of Tatarstan, Konstantin Tsitsin held a working meeting with the Prime Minister of the Republic of Tatarstan Alexey Pesoshin. During the meeting, topical issues related to the implementation of the regional program for the resettlement of citizens from the hazardous housing stock, recognized as such until January 1, 2017, were discussed in detail, which is carried out within the framework of the federal project "Ensuring sustainable reduction of uninhabitable housing stock", which is part of the national project "Housing and Urban Environment". As part of the working meeting, the General Director of the Housing and Utilities Fund Konstantin Tsitsin handed over to the Prime Minister of the Republic of Tatarstan Alexey Pesoshin a copy of an advance payment order in the amount of 132.74 million rubles for the implementation of the 2022-2023 stage of this program. The parties also discussed issues related to the resettlement of citizens from hazardous housing. Special attention at the meeting was paid to the implementation in the Republic of Tatarstan of projects for the modernization of communal infrastructure systems with the attraction of financial support at the expense of the state corporation. On the part of the Republic of Tatarstan, the event was attended by First Deputy Prime Minister of the Republic of Tatarstan Rustam Nigmatullin and Minister of Construction, Architecture, Housing and Communal Services of the Republic of Tatarstan Marat Aizatullin. On the part of the Housing and Utilities Fund, the working meeting was attended by Vladimir Talalykin, Chief Adviser to the General Director, and Oleg Radchenko, Director of the Department for Modernization of Utilities Infrastructure and Support for Federal Projects.
In Tatarstan, residents of Vasilyevo village will be provided with high-quality drinking water that meets all sanitary standards. For this, a water treatment plant is currently being built according to the national project “Housing and Urban Environment”. The head of the Department of Housing and Communal Services of the Ministry of Construction, Architecture, Housing and Communal Services of the Republic of Tatarstan Airat Gallyamov told this to reporters during a press tour to the facility. “Now the active phase of construction is underway. The project will be completed in November. As a result, residents of the Vasilyevo settlement will receive high-quality water that meets all sanitary standards,” - said the speaker. Gallyamov clarified that, according to Rospotrebnadzor, now the water in the village does not meet the necessary criteria. The implementation of the project will allow supplying the residents of the village with clean drinking water. The speaker added that according to the Clean Water project in Tatarstan, 93.8% of the population should be provided with high-quality drinking water. Based on the results of the project implementation in 2019, this figure was 92.8%. The cost of building a new water treatment plant is 139 million rubles. In general, more than 1 billion rubles are allocated for the implementation of the federal project "Clean Water" until 2024. At the moment, the readiness of the object is 65%. Works on the construction of an accumulation tank, a building for a water treatment station, a sewerage pumping station, sewerage networks and a block-complete transformer substation were completed. The water intake will be carried out from six existing wells, then it will be fed into the accumulating reinforced concrete monolithic reservoir with a capacity of 300 cubic meters.