NEWS


26
June 2019
Wednesday

Anna Budnikova, an architect from Kazan, won the Biodesign Challenge award in New York for the best research project. To announce her research to the international community, the architect was selected among 500 participants from 36 universities and high schools in the world. Together with the award, she received the right to publish research in international scientific journals. The Biodesign Challenge program is designed to support biotechnology students to solve global problems. Students' projects were presented to the scientific community on June 21, and before that (after selection) they, with the support of supervisor biologists, worked on their projects for half a year.

Irek Faizullin held a meeting to review the facade solutions of the school for 1224 students with a bedroom complex in Bondarenko St., Kazan, reconstruction of MAEI of Secondary School No. 165 in A. Bichurin St., Kazan, in accordance with the typology of the "Adymnar" brand book developed - multilingual educational complexes. The meeting was attended by the Deputy Minister Vladimir Kudryashev, the head of the state institution "The main investment and construction management of RT" Marat Aizatullin, Acting Director General State Unitary Enterprise "Tatinvestgrazhdanproekt" Khaidar Hasyanov, General Director of LLC "Gran" Leonid Anisimov, architects Elena Aralova, Marianna Sarkisyan, Alena Nesterova, Anna Khakimova, deputy head of the executive committee of the Soviet district of Kazan, Alsou Khamzina. In 2019-2022 in the Republic of Tatarstan it is planned to create 6 multilingual educational complexes. The best foreign and Russian practices in the organization of educational spaces, recreational zones and socialization zones of students, architectural solutions, technologies and equipment have been studied. In 2019-2022, it is planned to build 6 schools, 3 annexes to existing schools, 1 bedroom building and 4 kindergartens, reconstruction of the existing building of school No. 165 in Kazan, 2 additional education centers (out-of-town), repair of 2 schools, repair of 21 kindergartens.

Kazan State University of Architecture and Engineering developed the cultural and pilgrim route “Tukai Yuli - The Way of Tukai”. The new route got its name in honor of the Tatar poet Gabdulla Tukai and will cover the main places that were associated with his life and work. The route will cover the northern regions of the Republic of Tatarstan: Arsky, Atninsky, Baltasinsky, Vysokogorsky. In test mode, it will be held on 29 of June. “About 100 Kazan citizens will get by train from the central railway station to Arsk, and from there they will overcome the entire route on foot or by bicycle,” - the report said.

The total length of the route is 21 km, and the main points of destination are Nizhnye Meteski, Verkhnye Meteski, Mendush, Staryi Kırlay, Novyi Kırlay. Along the way, tourists will have the opportunity to get acquainted with the life and culture of Tatar villages, see the picturesque nature and taste the national Tatar dishes. At the end of the route, the participants will visit the Gabdulla Tukai Museum.


25
June 2019
Tuesday

The Inspectorate of the State Construction Supervision of the Republic of Tatarstan, based on the results of inspections since the beginning of 2019, issued 643 decisions on administrative violations for violations of the town-planning legislation. Of these, 39 are objects for state housing stock, 283 for commercial houses. The current date imposed fines totaling more than 18.2 million rubles.

The ministry has set up work to improve the legal and organizational tools and mechanisms to counter corruption. To assess and coordinate anti-corruption work, have been established a Commission under the Minister of Anti-Corruption and a Commission on Compliance with the requirements for official conduct of public servants and resolving conflicts of interest, composed of members of the Public Council, representatives of higher educational institutions and public leaders. In 2018, 6 meetings of the commissions were held. Work plans are reviewed and approved annually. The work was organized to provide independent anti-corruption expertise and public discussion of draft regulatory acts. In 2018, in order to prevent corruption-related factors, 134 draft regulatory acts were examined.


24
June 2019
Monday

A delegation of members of the Federation Council and deputies of the State Duma of the Russian Federation arrived in Tatarstan to assess the implementation of national projects. The results of the departure will be discussed with the party activists of the republic. Representatives of the parliament - Senator Irek Yalalov, along with State Duma deputies Vladimir Afonsky and Irek Zinnurov, accompanied by representatives of the Ministry of Construction, Architecture and Housing of the Republic of Tatarstan, evaluated the implementation of the national project “Housing and Urban Environment”. The guests visited the park on Absalyamov Street, the residential complex "Vesna": the park "Vesna", a school for 1501 places and a kindergarten for 340 places: The area of ​​the residential complex "Vesna" is 31.15 hectares. The complex includes a group of 10 and 19-storey buildings with underground parking lots and built-in offices and service institutions. On the territory of the complex two kindergartens for 340 places each, a school for 1501 places, two multi-storeyed parkings for 989 and 1096 cars/ places are designed. The project envisages the formation of a continuous system of gardening of common areas, linked to the natural frame of the city. The system of landscaping common areas is formed by creating a recreational zone (park) along the Knox River, creating boulevards connecting the park with a residential complex, and creating residential and public buildings in the newly developed areas. The total area of ​​the recreational landscape zone is 10.8 hectares.

In 11 years, 635 apartment buildings with a total area of ​​1,448.1 thousand square meters were repaired in Bugulminsky municipal district. During this time, housing conditions have improved more than 64.6 thousand of citizens. The total funding amounted to 2388.1 million rubles. In 2019, 47 houses are planned to be improved. Financing of the program is 218.374 million rubles. Director of the Housing and Public Utilities Department of the Bugulminsky District, Rinat Manasypov, said that today work has begun in 38 apartment buildings, which is 80.8% of the total. Works are planned to be completed by 1st of October, 2019. “In the list of mandatory works: replacement of central heating systems, water and electricity supply, repair of facades and roofs. Special attention is paid to improving the energy efficiency of housing and communal services,” - Rinat Manasypov said.

In the Republic of Tatarstan, under the program of overhaul repairing of apartment buildings in 2019, work was performed by 35.6%. In total, within the framework of the overhaul repairing program, it is planned to repair 942 apartment buildings in 42 municipalities. This was announced today by the Minister of Construction, Architecture and Housing of the Republic of Tatarstan Irek Faizullin at a meeting in the House of Government of the Republic of Tatarstan. In his report, Irek Faizullin reported that as of 20th of June, work was underway on the overhaul of 23 buildings (premises) of executive committees (Councils) of settlements in the municipal districts of the Republic of Tatarstan. In total, the program declared 31 objects. On seven sites works have been completed. As part of the overhaul of the buildings (premises) of the youth centers of the Republic of Tatarstan and the strengthening of their material base, work is being carried out at 8 out of 9 facilities. At one site, work has been completed. The overhaul of teen clubs is being carried out at 21 sites. Five objects have already been handed over. Also on 20th of June, work is underway on 31 of 34 institutions of social services of the Republic of Tatarstan. The overhaul repairing is completed at two sites. Overhaul repairing of 13 premises of municipal archives is planned in the republic. As of 20th of June, work is underway on 10 out of 13 facilities. On the 20th of June, the overhaul repairing of 6 health facilities is being carried out, with medical equipment and furniture being upgraded. On 3 sites works have been completed.


21
June 2019
Friday

In the Drozhzhanovsky municipal district of the Republic of Tatarstan overhaul repairing of rural clubs was completed. Rural houses of culture in the village of Novye Kakerli and the Starye Chukaly were repaired as part of the implementation of the Republican program for the overhaul repairing of cultural facilities in 2019. During the work on the buildings, the floors, the stage and the internal engineering networks were repaired. Note that in 2019 in Tatarstan it is planned to overhaul 40 buildings of rural clubs. More than 400 million rubles were allocated from the budget of the Republic for these purposes. To date, the implementation of the program is more than 50 percent. Also at the facilities of Alkeevsky, Apastovsky and Kaybitsky municipal districts of Tatarstan, construction and installation works have been fully completed.

The joint meeting of the Russian Union of Builders, the National Association of Builders and the Committee of the Chamber of Commerce and Industry of the Russian Federation on Entrepreneurship in the Construction Industry with the participation of the leaders of the Republic of Tatarstan and representatives of organizations and enterprises of the construction industry is broadcasted online. The meeting was attended by President of the Russian Union of Builders Vladimir Yakovlev, Minister of Construction, Architecture, Housing and Communal Services of the Republic of Tatarstan Irek Faizullin. The live broadcast is available at the following link.


SUBSCRIBE FOR NEWS
All content on this site is licensed under
Creative Commons Attribution 4.0 International