This year 995 apartment buildings will be repaired in Tatarstan. For these purposes, nearly 6.1 billion rubles have been allocated, of which less than 1.4 billion rubles fall to the budget of republic, to the budget of municipalities - almost 0.9 million rubles, citizens' funds - more than 3.8 billion rubles. This was at a press conference in IA "Tatar-inform" told the deputy director of the Main investment and construction department of the Republic of Tatarstan Airat Abuzyarov. In total, it is planned to improve the living conditions of more than 224 thousand residents of the republic. The planned works include the repair of the facade, roof, sewerage network, water supply and heat supply networks, as well as the repair of the porches.
In the kindergarten of the Biryulin village of Vysokaya Gora, at last, major repairs were carried out. It became possible due to the presidential program "Capital repairs of educational facilities". "Belochka" - the third renovated kindergarten in the district. There are also schools in the program. The year 2019 will become a jubilee year for the kindergarten. He will be exactly forty-five years old. Almost half a century old the building does not remember such repairs. Only once the roof was changed . Now the kindergarten has acquired not only beautiful walls and new furniture, but also a reliably planned and updated communication system.
In 2018, six agro-formations were inscribэed in the republican program, which included the overhaul of cowsheds, machine and tractor parks, grain crops and the construction of silo-senile trenches. Within the framework of this program, the society "AgroMir", along with the construction of a base for juicy feed, will have to equip the cowshed with 200 cattle, a machine and tractor park, and grain crops. In the last mentioned object, by the way, capital repair is in the final stage.
In the current year, the construction of 97 sports grounds for 310 million rubles is planned in the republic. The head of the department for the development of the construction complex Dinar Sagdatullin told about it in the framework of the familiarization press tour organized by the Ministry of Construction, Architecture, Housing and Communal Services of the Republic of Tatarstan. "Since the implementation of the program from 2013 to 2016 in the Republic of Tatarstan, 671 sports grounds have been built with a total funding volume of 1 491.6 million rubles, including 1,447.5 million rubles from the republic's budget, 44.1 million rubles from of the federal budget. In 2017, 120 sports grounds were built," - said Dinar Sagdatullin.
In Naberezhnye Chelny within the republican program of educational facilities, nine kindergartens will be overhauled. For these objects were allocated 230.8 million rubles from the republican budget and 42 million rubles from city buget. In the kindergarten "Topol'ok" replaced the roof, carried out repair works of hot and cold water supply systems, repair of toilets, replacement of windows and doors, devices of a warm floor on the first floors. To create comfortable conditions for children, the walls were painted in bright colors. Their design was developed by students of the Naberezhnye Chelny State Pedagogical University. Major repairs also take place in the following preschool institutions: "Alenkyi Tsvetochek", "Rosinka", "Malish", "Snezhinka", "Alan", "Antoshka", "Buratino" and "Teremok". Opening is planned in the near future.
On July, 28, speaking at the Government House of the republic at a regional video-conference held by Tatarstan President Rustam Minnikhanov with participation of Prime Minister of the republic Aleksey Pesoshin and all regional municipalities, Minister of Construction, Architecture, Housing and Utilities of the republic Irek Faizullin reported on the implementation of capital repair of multi-apartment houses in Tatarstan.
LLC "ISK Varikus" issued a permition to put into operation an 8-section, 286-apartment house No. 2, at the address: RT, Kazan, str. Lukina, 50.
During the press tour, representatives of the mass media got acquainted with the execution of works on the overhaul repairing of the barn for 100 heads in Verkhny Veresi, and also visited the covered grain seedlings repaired this year in Smak-Korsa village, Arsk District. Since 2016, the program for the repair of machine-tractor parks started.Totally, during 4 years, 1171 cowsheds, 91 vegetable storage facilities, 118 machine-tractor parks and 539 silo-silt trenches were repaired under these programs. In 2017, due to the budget savings, following the results of 2016, 15 machine and tractor parks and 30 barns were additionally repaired. In 2018, it is planned to overhaul 232 cowsheds, 64 machine and tractor parks, 11 vegetable storage facilities and construction of 123 silos and senage trenches. In addition, starting in 2018, the program of capital repairs of grain farms will start. Within the framework of the republican program 128 grain farms are planned to be repaired for 373.2 million rubles.