In the Republic of Tatarstan, as of 7th of March, 2019, 522.1 thousand square meters of m. housing were put into operation, what is 21.5% of the plan. This was announced today at the Republican meeting in the Government House of the Republic of Tatarstan by the Minister of Construction, Architecture, Housing and Communal Services of the Republic of Tatarstan Irek Faizullin. The head of the Ministry of Construction of the Republic of Tatarstan said that in the field of labor protection, the Inspectorate of State Construction Supervision and the State Labor Inspectorate from the beginning of 2019 conducted 235 inspections. For violation of the rules and regulations of labor protection issued 42 decisions totaling 1 million 780 thousand rubles. Under the program of multi-unit investment housing 24 houses (154.2 thousand square meters in area) were commissioned, besides, there are 107 houses in the rest. There are 50 houses in the high degree of readiness for the remaining 107 multi-apartment investment residential buildings; on average readiness - 36 houses; in a low degree of readiness - 21 houses (construction started, readiness up to 30%). Irek Faizullin reported during the meeting that in the Republic of Tatarstan, 235 apartment buildings were being built by 91 developers.