In Zainsky kindergarten “Berezka” for the 32 million rubles allocated from the national budget, overhaul repairing is underway. To date, preschool institutions are working on the weatherization of the facade and covering it with ceramic granite, the glazing of the central entrance. In addition, the territory of the kindergarten is equipped with eight video cameras. At the moment, in the pre-school institutions, the old communications are also being replaced - the heating, water supply and ventilation systems. Energy-saving lamps will be installed everywhere, in the ground floor groups a warm floor. The fire protection system is already mounted. The walls will be textured and painted using colors of pastel shades. In the correctional school number 9 this year the third phase of the overhaul repairing is already underway. The director of the educational institution Gulnara Moykina reported that the republican program for more than 13 million rubles on the second floor was redecorated, the workshop was put in order, where industrial technology classes held for boys. In the workshops are actively repairing the roof, facade, finishing works are performed inside, replacement of communications. The warm transition that connects the main building with the gym and workshop is also being put in order. Builders plan to complete the repair work by 1st of September.