On June 25, Tatarstan President Rustam Minnikhanov together with Deputy Prime Minister of Russia Marat Khusnullin and First Deputy Minister of Construction, Housing and Utilities of Russia Irek Faizullin, Mayor of Kazan Ilsur Metshin and other officials inspected the progress of construction of some facilities in Kazan.
The embankment of Lower Kaban Lake, where landscaping is underway, was the first facility inspected. The embankment of Kaban Lake near the Kamal Theater has already been commissioned, and everyone can appreciate comfortable walkways, a playground with a game water complex with a system of hydraulic structures for children. There is also a rental point for catamarans and boats there.
Then, the guests inspected the progress of the improvement of the second stage of the embankment on Nazarbayev street. A rowing school, sports grounds will be built there, landscaping will be carried out, new areas for pedestrians and cyclists will be created. It is also planned to build phyto-treatment facilities with an aquatic family of plants. By the end of this August, it is planned to complete the entire range of work.
During the inspection, Minnikhanov talked to people having a rest on the embankment, asked their opinion regarding the convenience of the embankment and the recreation areas located there.
Then, they visited the construction site of a new infectious diseases hospital. A 4-story medical building is designed for 234 beds. If necessary, their number can be increased up to 504 beds. In addition to the main building of the infectious diseases hospital, a new laboratory complex will be erected. The project provides for the construction of a diagnostic department, a waste disinfection unit, anesthesiology and intensive care unit, and other departments.
Later on the same day, Minnikhanov and Khusnullin inspected the progress made in the construction of the Great Kazan Ring Road. Work on this facility is carried out in two stages. The first stage involves work on the site from Midhat Bulatov street to Boriskovskaya street, where a four-lane road with a length of 800 metres with an overpass over Fermskoye high road and a pedestrian crossing is being built. Together with that, builders lay tram rails to Tekhnicheskaya street. All work is carried out in accordance with the approved schedule.
Today, in the Kazan settlement Derbyshki, the opening of the Palace of Culture named after S. Said-Galiev took place after a major overhaul. The ceremony was attended by Deputy Prime Minister of the Russian Federation Marat Khusnullin, President of the Republic of Tatarstan Rustam Minnikhanov, Deputy Minister of Culture of the Russian Federation Vladimir Osintsev, Prime Minister of the Republic of Tatarstan Alexei Pesoshin and Kazan Mayor Ilsur Metshin. Marat Khusnullin noted that the repair of the recreation center named after S. Said-Galiev took place in a difficult period, associated with the epidemiological situation and economic difficulties. “Despite all the difficulties, work at the facility was completed on time. I remember this recreation center, I remember how we came here as children. Then in some years, he was not in the best condition. The fact that today it is opened in such a beautiful form is a huge achievement. I want to thank the leadership of the republic for finding the opportunity to bring the building into such excellent condition,” - said the Deputy Prime Minister of the Russian Federation. Rustam Minnikhanov emphasized that the recreation center named after S. Said-Galiev was always in great demand among the townspeople. Over a 60-year history, more than 30 million spectators have visited various cultural and leisure events. Creative groups won prizes at Russian and international festivals and forums. “I am sure that this object will be one of the great assets of our capital,” - said the President of the Republic of Tatarstan. Overhaul started last summer. House of Culture named after S. Said-Galiev is one of the most richly decorated buildings. The rooms are decorated with unique author's chandeliers and sconces, the author's stucco molding made in the art workshops of Leningrad. Therefore, much attention was paid to restoration work.
On June 23, Tatarstan State Counsellor, Chairman of the Board of Trustees of the Revival Regional Foundation Mintimer Shaymiev held a retreat on construction of the first multilingual educational complex “Adymnar – the pathway to knowledge and harmony” in Kazan.
Shaymiev and meeting participants got acquainted with the reconstruction process of the building of Secondary School № 165 on Bichurin Street and the construction of a bilingual school for 800 students of 5-11 grades, which is being completed. This school includes: a canteen with a dining room with a capacity of 400 places, a swimming pool, a gym, wardrobes, workshops on the 1st floor, an assembly hall for 500 people, study rooms, a library on the 2nd floor and study rooms on the 3rd and 4th floors. The total area of the building is about 14,000 square meters.
Reconstruction of the old building is underway. After the capital repair there will be an elementary school with the capacity of 400 students.
Then, in one of the future classrooms, a meeting on the discussion of issues requiring an urgent solution was held.
Shaymiev emphasized that by September 1 of the current year, it is planned to commission three buildings - three schools: the reconstructed elementary school, a new bilingual school on Bichurin Street and a multilingual school on Bondarenko Street, all together, including kindergartens and a country supplementary education centre, they establish the first multilingual educational complex “Adymnar - the path to knowledge and harmony” in the republic. “The first complex is our first step towards a new form of education, therefore a lot depends on our work today, it will determine the approaches to education development in the future. Changes in the education system are inevitable, dictated by time, the openness of the world, and we shall give our children the opportunity to be competitive. This historic moment is in our hands. The amount of work at the complex is enormous, but we must complete it on time, even in the pandemic. It must be done well that everyone can be proud, because it is for our children,” Tatarstan State Counsellor emphasized. He thanked Mayor of Kazan Ilsur Metshin for the full support and efficient of the city administration in resolving emerging issues on construction.
Metshin thanked all the participants of the project and emphasized that, in addition to construction of an excellent school, a lot of necessary and important work are being done for residents of the capital and its surroundings to improve travel conditions, etc.
Director of Secondary School № 165 Aydar Shamsutdinov introduced a new project, initiated by Kazan Mayor “Growing together – Bergә уsәbez”, which envisages the establishment of a microcloning laboratory at the Bondarenko Street campus: Growing tree seedlings in a short time.
The project, developed by Kazan Education Department, is aimed at involving children in the conservation and restoration of urban forests and trees planting in the courtyard and school areas.
Deputy Chairman of the State Council, Executive Director of Revival Foundation Tatyana Larionova, Deputy Prime Minister of the republic – Tatarstan Minister of Education and Science Rafis Burganov, Deputy Chief of Staff of Tatarstan President’s Administration Oleg Glebov, Tatarstan Minister of Construction, Architecture and Utilities Farit Khanifov and other officials took part in the meeting.
Overhaul of the kindergarten building is carried out at the expense of the republican program. In the village of Verkhnee Almurzino, Alkeevsky district of Tatarstan, work is underway to overhaul the kindergarten "Alsu". It is planned to take pupils to a preschool institution on September 1. A huge part of the repair work has already been completed at the preschool educational institution. Builders poured concrete floors, erected an extension of the blocks.
Now in the village of Stariye Mataki, Alkeevsky district, 299 people live. The medical and obstetrical station is located in the center of the village near the local House of Culture. Now the builders have already installed a modular building, summed up the water supply and sewage networks. The area around the medical and obstetrical station will also be ennobled.
Thanks to the presidential program of the overhaul of healthcare facilities, the building will take on a new look. In the building of the infectious ward of Bazarnye Mataki central district hospital, repair work began. The other day, the builders of the “Stroydorservis” company began roofing. According to the first deputy head of the district executive committee Sergei Balakirev, 62 million rubles were allocated from the republican budget for major repairs. With the same funds, the furniture will be acquired and the territory adjacent to the infectious diseases department will be ennobled.
According to housing construction programs as of June 19, 1 million 162.8 thousand square meters of housing were commissioned in the republic - 39% of the plan. The dynamics of housing commissioning over 2 weeks amounted to 96.6 thousand square meters. This was announced today by the Minister of Construction, Architecture and Housing of the Republic of Tatarstan Farit Hanifov at a meeting in the Government House of the Republic of Tatarstan. The Inspectorate of State Construction Supervision of the Republic of Tatarstan from the beginning of the year conducted 540 inspections. The Minister reported that 76 decisions totaling 3 million 255 thousand rubles were issued for violation of labor protection rules and norms. Self-regulatory organizations audited 552 organizations - members of SROs. As part of providing housing for large families, all 46 families received certificates. Subsidies are also listed for 32 young families. To provide housing for 35 citizens among internally displaced persons, immigrants from the Far North and Chernobyl residents, 20 certificates were issued. On June 20, 8 certificates were implemented.
Such a statement was made by the Deputy Chairman of the Presidium (headquarters) of the Government Commission for Regional Development - First Deputy Minister of Construction, Housing and Communal Services of the Russian Federation Irek Fayzullin, welcoming the participants of the VolgaStroyExpo fair on June 17. He also talked about changes in the industry, simplifying a number of procedures in construction. Irek Fayzullin recalled that since July 1, 2018, all project documentation and expert opinions on it have been submitted to the Unified State Register of expert opinions on project documentation of capital construction projects, including the possibility of re-applying cost-effective projects. “But this also provides for a very responsible attitude of designers and experts to the quality of the downloaded documentation. I pay special attention to the importance of this moment. It is necessary to amend the project documentation, if any, before January 1, 2021,” - the first deputy head of the Russian Ministry of Construction emphasized.
The President of the Republic of Tatarstan Rustam Minnikhanov examined a number of facilities under construction in Kazan today. He was accompanied by the Minister of Construction, Architecture, Housing and Communal Services of the Republic of Tatarstan Farit Khanifov, Kazan Mayor Ilsur Metshin, representatives of contractors. The first object of a working detour was the site next to the Republican Clinical Infectious Disease Hospital named after Professor A.F. Agafonov, where the construction of the second building of the RCIDH continues today. The four-story medical building is designed for 234 beds. If necessary, their number can be increased to 504 places. In addition to the main building of the infectious diseases hospital, a new laboratory complex will be erected. The second building of the RCIDH includes an admission and diagnostic department, 10 admission and examination boxes, an antishock ward, CT, ultrasound investigation, X-ray, surgeries and operating rooms.
The Russian Ministry of Construction made a proposal on the disclosure of escrow accounts immediately after the developer received permission to put the facility into operation - before the first ownership of the facility for participation in shared construction was registered. This was stated by Minister of Construction, Housing and Communal Services of the Russian Federation Vladimir Yakushev during a plenary meeting of the Federation Council on June 17. “Our joint position with the Central Bank is as follows. At the moment, the system and banks are not ready for such a difficult issue, because it requires strict administration. This topic has been postponed for the medium term, but the amendments that are being prepared to the 214th Federal Law propose the following solution: you can transfer funds to the developer and open escrow accounts not after registering ownership, but immediately after the facility is put into operation. We believe that at this stage there are already no risks, and the developer will receive at least three months earlier his money that was invested in the implementation of a specific project, return project financing, and accordingly will cease to pay interest for it,” - said Vladimir Yakushev.