NEWS


3
August 2017
Thursday

In Fedorovskoe village of the Kaibitsky district, within the framework of the republican program, the construction of a universal sports ground is nearing completion. The facility is equipped with two modular locker units, stands for spectators for 100 seats, covered with rubber coating and marking for the possibility of volleyball, basketball and mini football games organization. Lighting the area will allow you to play games in the darkness hour. The opening is planned for September 1.

The Arsk district continues construction and major repairs of agricultural facilities, within the framework of the republican program. This year, 27 farms are under repair, 14 silos and haylage trenches are being built", - said Marat Abdullin, head of the financial and economic department of the regional department of agriculture and food. Having joined the program, the society "Severny" annually performs repairs of cowsheds. In the current year "Kazanka"  farm started repairing three cattle-breeding premises in Kuperbash. Innovations also exist in the society "Revival". Two silos-senazhnye trenches were built. Soon will work its own workshop for the production of mixed fodder.


2
August 2017
Wednesday

During the period from 2011 to 2016 in Tatarstan were built 35 new schools designed for a total of 9,300 students. Deputy Minister of Construction, Architecture and Housing of the Republic of Tatarstan Ilshat Gimayev told about that today at a press conference in the Information Agency "Tatar-inform".

In the Nizhnekamsk municipal district actively carried out work within the framework of the federal program for the overhaul of residential multi-apartment buildings. Aِccording to the data on August 1, the volume of performed work average 82%.

Two new schools will be commissioned in Kazan for the new  2017-2018 school year. Deputy Minister of Construction, Architecture and Housing of the Republic of Tatarstan Ilshat Gimayev told about that today at a press conference in the Information Agency "Tatar-inform".

In accordance with the audit plan agreed by the Prosecutor's Office of the Republic of Tatarstan, Chistopol ZZHI in July 2017 carried out scheduled inspections with respect to OOO “Uyut” Management Company in Nurlat and OOO MC of Alekseyevsky District (started in June 2017), and scheduled inspections in relation to the Municipal Unitary Enterprise "Housing and Communal Services" in Nurlat, the OOO "Zhilischnik-2", the OOO "Zhilischnik-3" and the OOO "Nash Dom" in Chistopol (currently being carried out, not yet completed). In the course of planned inspections of the specified management companies conducted a comprehensive survey of 56 apartment buildings with a total area of 98,841 thousand square meters, revealed 209 violations, for the removal of which issued 48 prescriptions.

 

 


27
July 2017
Thursday

Federal state statistics service (Rosstat) has published a report on the volume of housing construction by regions and Federal districts of Russia for the 1st half of 2017. According to statistics, Tatarstan took the first place in Volga Federal district and the fifth place among the subjects of the Russian Federation. As of July 20, commissioned in Tatarstan 1 252,8 thousand square meters of housing.

Deputy Minister of construction, architecture and housing of Tatarstan Ilshat Gimaev held a meeting with representatives of the Corporation "China Road" (PRC), under which the parties discussed possible areas of cooperation.

Representatives of the Corporation "China Road" (China) held a presentation of the company. Deputy General Consul of China, Cheng Wei said that Tatarstan visited the representatives of China, various business delegations. He expressed hope that this visit will contribute to strengthening bilateral cooperation.

Ilshat Gimaev thanked the delegation of China for their interest in Tatarstan. The parties to the meeting agreed to explore potential cooperation in the future to establish direct partnerships.


26
July 2017
Wednesday

Urussinsk kindergarten № 2 is going to be repaired. In the rooms windows and doors are replaced, completely updated internal engineering systems. In bathrooms sink equpied in accordance with the requirements of SanPiN, construction and installation works under the programme was completed, - said the head of the institution Gulnara Ziganshina. Major repairs were carried out in the framework of the Republican program.


24
July 2017
Monday

The Ministry of construction submitted to the Government of the Russian Federation the draft resolution, which establishes requirements for project documentation to ensure compliance with the energy efficiency requirements of equipment of buildings and constructions metering devices of used energy resources. This July 20 at an expanded meeting on issues of improving the system of pricing in construction in Irkutsk, said the Deputy head of the Ministry of construction of Hamit Mavliyarov.

"The project documentation should be included lists of activities that will ensure compliance with the established requirements of power efficiency and requirements of equipment of buildings and constructions metering devices of used energy resources," said rude of Mavliarov.

As explained the Deputy Minister, the project documentation must now be added, which contains the rationale adopted by the architectural, functional-technological, constructive and technical solutions, used in power supply systems, water supply, gas supply, heating, ventilation and air-conditioning facilities, heat networks in industrial facilities.

In the sections of project documentation, containing information about the engineering equipment, on networks engineering-technical maintenance, additionally provides for the description of the locations of metering devices of used energy resources, devices gather and transmit data from such devices.

In addition, the project documentation should contain summary information about the consumption of energy resources and energy efficiency of object of capital construction; energy-using equipment, renewable energy, lists energy efficiency requirements, which the building, structure, and construction must comply with when commissioning and in operation, the locations of the metering devices of used energy resources, devices gather and transmit data from such devices.


SUBSCRIBE FOR NEWS
All content on this site is licensed under
Creative Commons Attribution 4.0 International