Kazan Arena Stadium connected to heat networks

14 May 2013, Tuesday

“Kazan Heat Distribution Company” OJSC completed the connection of the next Universiade 2013 Venue – Kazan Arena Stadium to its heat networks, as reported by the press service of the company.

The area of the stadium for 45 thousand spectators is more than 134 thousand square meters. The facility is provided with heat and hot water by means of corrosion-resistant pipes in modern polyurethane foam insulation, equipped with a signal cable to connect the devices of the rapid remote humidity control system.

The stadium is a new type energy consumer, where modern transportation facilities for heat and hot water are used. In particular, there are independent systems based on four individual heating units, the main operating element of which is a heat exchanger. It takes the required amount of heat from the network to maintain a comfortable temperature in premises.

“Kazan Heat Distribution Company” OJSC is the only supplier of heat and hot water to the main Venue of the Universiade 2013.

SUBSCRIBE FOR NEWS
All content on this site is licensed under
Creative Commons Attribution 4.0 International